#Our Project
Our Projects

Installation of 100 TB Power Scale Storage, at Cold Rolling Mill, OARC, Oman
$50.99
- Implemented a robust storage system with cyber protection and other advantages for in-house storage solutions.
- Offered a unique solution for OT networks, enhancing data security and accessibility.

Revamped Rail Finish Area - Bed Splitting & Automation at Finish Line in RUBM, JSPL, Raigarh, India
$599.99
- Upgraded the rail finish area with bed splitting and automation technologies.
- Streamlined the finish line operations for higher throughput.
- Achieved significant reductions in manual intervention and processing time.

Implementation of Hot Billet Charging Project in Bar Mills at Emirates Steel, Abu Dhabi, UAE
$50.99
- Successfully implemented a hot billet charging system in bar mills.
- Increased energy efficiency and reduced material handling time.
- Optimized the overall production process, enhancing output quality and consistency.

Online Chemistry Utilization Project Implementation at Cold Rolling Mill, OARC, Oman
$599.99
- Introduced an online chemistry utilization system in the cold rolling mill.
- Enhanced the accuracy of chemical composition analysis in real-time.
- Improved product quality and reduced waste in the cold rolling process.

Successful Remelt Level #2 Automation System Commissioning at OARC, Sohar, Oman
$50.99
- Implemented Level #2 automation systems for enhanced process control.
- Achieved significant improvements in operational efficiency and data accuracy.
- Facilitated better process monitoring and optimization at OARC.

Successful Commissioning of Rail Head Hardening & HOT Saw at RUBM, JSPL, Raigarh, India
$599.99
- Delivered and installed advanced rail head hardening and HOT saw systems.
- Ensured seamless integration with existing infrastructure.
- Improved production efficiency and quality control in the rail manufacturing process.

Commissioning & SAT Testing of Rail Straightening Machines at RUBM, JSPL, Raigarh, India
$50.99
- Commissioned state-of-the-art rail straightening machines.
- Conducted Site Acceptance Testing (SAT) to ensure performance standards.
- Enhanced the precision and efficiency of the rail straightening process.

Commissioning & SAT Testing of Sistem Teknik Remelt 120 Ton Furnace at OARC, Sohar, Oman
$599.99
- Commissioned and tested a 120-ton Remelt furnace from Sistem Teknik.
- Conducted comprehensive SAT to verify operational standards.
- Improved the melting process efficiency and product quality in the OARC facility.